Value
£2.4 million
Construction
16 weeks
Area
60,000 sq ft
New 35,000 sqft mezzanine floor within a 200,000 sqft Distribution centre, with the construction area sectioned off with a temporary full height jumbo stud partition to create an adjoining dust free working environment, to allow the client’s continued business operation.
Project works included: civils for the mezzanine steel framework, , supply and installation of 3no. goods lifts, new distribution conveyors complete with compressed air and fire suppression, together with new sprinklers, high & low-level lighting and fire detection.
Existing Male, Female & DDA toilets refurbished
![Image by Vladimir Gladkov](https://static.wixstatic.com/media/ffb9d2_5012a0ae39c44beeb114573b9c5258a3~mv2.png/v1/fill/w_40,h_27,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image%20by%20Vladimir%20Gladkov.png)
![Image by Vladimir Gladkov](https://static.wixstatic.com/media/ffb9d2_6b8da961a41d42b8bdc0c55c80dda055~mv2.png/v1/fill/w_67,h_86,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image%20by%20Vladimir%20Gladkov.png)
![Image by Vladimir Gladkov](https://static.wixstatic.com/media/ffb9d2_7abb0f083ff341d783718fb14bb57c68~mv2.png/v1/fill/w_82,h_86,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image%20by%20Vladimir%20Gladkov.png)
![Image by Vladimir Gladkov](https://static.wixstatic.com/media/ffb9d2_ac94caa218ea4b7f8bcae6b493aca173~mv2.png/v1/fill/w_41,h_27,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image%20by%20Vladimir%20Gladkov.png)
bottom of page